A river winding through green lowland, seen from the air

Environautics Management

One operation.Four systems.

Water, carbon, energy and compute. The technology, the strategy and the business model that captures the value.

Water · Carbon · Energy · ComputeAgriculture · Production · Buildings

We work in emerging, complex arenas where technology, digital infrastructure, economics and impact converge. Our job is to compound the value inside systems that are fundamentally environmental.

Four markets. Each with its own rules, its own units and its own specialists.

One site. The same pipes, fields, furnaces and server halls move several at once.

One business model. Built on where they overlap.

A river winding through wetland, seen from above
I

Water

Saved, reused or restored, and counted basin by basin.

In agriculture

  • Irrigation efficiency
  • Water rights, leases and transfers
  • Nutrient and water-quality credits

In production

  • Reuse and recycling
  • Avoided withdrawal in stressed basins
  • Discharge and treatment cost
  • Replenishment funded by customers

In buildings

  • Cooling water and fixtures
  • Leaks found and stopped
  • Rain and greywater reuse
  • Stormwater fees and credits
What is sold, and the reading on water
An industrial processing plant under a clear sky
II

Carbon

Reductions and removals, counted from what the operation actually does.

In agriculture

  • Soil carbon and lower nitrous oxide
  • Methane from manure and rice
  • Biochar and other removals
  • Low-carbon crop programmes paid by buyers

In production

  • Process and fuel emissions cut
  • Captured CO2, stored or used
  • Low-carbon product premiums
  • Border and compliance costs avoided

In buildings

  • Fines avoided under building performance rules
  • Refrigerant leaks cut
  • Low-carbon concrete, steel and timber
  • Certification that tenants and lenders ask for
What is sold, and the reading on carbon
Rows of solar panels in a field, seen from above
III

Energy

Power, heat and fuel: what is made, what is saved and what the grid will pay for.

In agriculture

  • Biogas and renewable natural gas
  • Solar on and beside farmland
  • Pumping cost and demand charges
  • Crop-based fuels

In production

  • Heat recovery and electrification
  • On-site generation and storage
  • Demand response
  • Certificates and power contracts

In buildings

  • Efficiency retrofits
  • Heat pumps and electrification
  • Rooftop solar and storage
  • Demand response
What is sold, and the reading on energy
A data centre with rooftop cooling units beside fields and woodland, seen from the air
IV

Compute

The newest system. It is sold by the chip-hour, it has no agreed measure, and it runs on the other three.

It draws energy

  • Power contracts and the grid connection
  • On-site generation
  • Load the grid will pay to move
  • Waste heat sold to a neighbour

It draws water

  • Cooling: evaporate water or spend power
  • Recycled water supply
  • Replenishment in the same basin

It carries carbon

  • Clean power matched by the hour
  • Emissions from on-site gas and backup
  • Removals bought against the rest
What is sold, and the reading on compute

Where they meet

Three places. Each runs on more than one.

A patchwork of farm fields with a solar array, seen from the air

Agriculture

69%
of the freshwater the world withdraws
22%
of greenhouse gas emissions, with forestry and land use

A digester on a dairy makes fuel, cuts methane and changes how nutrients reach water. Sold as an energy project, the rest never reaches the numbers.

Projects and reading on agriculture
The towers and pipework of a processing plant

Production

19%
of the freshwater the world withdraws
34%
of greenhouse gas emissions, counting the power and heat it buys

Returning steam condensate at a plant saves fuel, emissions and water in one move. It is usually budgeted as maintenance.

Projects and reading on production
City blocks and rooftops seen from directly above

Buildings

12%
of the freshwater the world withdraws, as municipal supply
16%
of greenhouse gas emissions, counting the power and heat they buy

A cooling tower rejects heat by evaporating water. Cut the cooling load and the power bill, the emissions and the water bill fall together. The project is usually approved on the power bill alone.

Projects and reading on buildings

Biomass is not a system of its own. It is the material agriculture grows and production converts, and it is paid for through water, carbon and energy and through the product itself.

Figures: FAO AQUASTAT and IPCC AR6 WGIII, chapter 2.

Receipts

Value in these systems is paid on a receipt. Read it before you count it.

A carbon credit, an energy certificate and a water benefit each say that something happened and that one party may count it. Four things are printed on every one.

  1. 1

    Claim

    What the holder is allowed to say.

  2. 2

    Unit

    What is being counted.

  3. 3

    Issuer

    Who stands behind it.

  4. 4

    Time

    When it happened and how long it lasts.

  • Receipt

    Carbon credit

    Claim
    One tonne reduced or removed
    Unit
    Tonne of CO2e
    Issuer
    A registry, under a published method
    Time
    The year it happened, and how long the carbon stays stored

    Small print: which place, and against what baseline.

  • Receipt

    Energy certificate

    Claim
    One megawatt-hour came from a named source
    Unit
    Megawatt-hour
    Issuer
    A tracking system or regulator
    Time
    The year it was generated. Increasingly the hour.

    Small print: which place, and against what baseline.

  • Receipt

    Water benefit

    Claim
    A volume saved or restored in a named basin
    Unit
    Cubic metres a year
    Issuer
    Often none. The buyer counts it under a published method.
    Time
    Each year the project keeps working

    Small print: which place, and against what baseline.

  • Receipt · not yet written

    Compute

    Claim
    A system delivers a stated performance
    Unit
    Chip-hours. No agreed measure of the work done.
    Issuer
    The seller, on its own specification
    Time
    The hour it ran. The same hour on newer hardware is a different product.

    Small print: which place, and against what baseline.

The same four words mean different things on each receipt. Most lost value, and most bad claims, come from reading one as if it were another. The fourth receipt does not exist yet. Compute is sold on specifications, and the measure that would make it comparable is still being agreed.

The catch

The value is in the overlap. So are the mistakes.

  1. 1

    One action moves several systems.

    The same pipe, field or furnace moves water, carbon and energy together. Price one and the other two are left out of the numbers.

    Read the piece
  2. 2

    Some claims stack. Some cancel.

    Sell the certificate and you may lose the right to the claim. Take the grant and the credit may no longer be additional. Knowing which revenues add up and which exclude each other is most of the work.

    Read the piece
  3. 3

    The specialist is paid on the instrument.

    A carbon developer sells credits. A solar developer sells megawatts. Neither is paid to tell you that something else at your site is worth more. We work for the operator.

    Read the piece
A farm with round biogas digester tanks among fields, seen from above

One site. Fields, digesters, roofs, a grid connection and a water right. Every system, read together.

The business model

Five parts. Miss one and the project stalls.

  1. 1

    Physical balance

    What goes in and what comes out, in tonnes, gallons and kilowatt-hours. If the balance is wrong, every number after it is wrong.

  2. 2

    Unit economics

    Cost and price per unit, delivered. The break-even price before a single credit is counted.

  3. 3

    Evidence

    A method and a record that someone else can recompute. A claim nobody can re-check is not worth a premium.

  4. 4

    Buyer

    A named counterparty and the terms. A credit without a buyer is inventory.

  5. 5

    Split

    Who funds, who operates, who supplies, and what each one earns. Written down before the first unit is produced.

Where we are brought in

  • Three vendors have pitched three projects for the same site.
  • The science is done and there is no buyer.
  • A waste stream or a resource should be a revenue line and is a cost.
  • A new technology works and nothing yet pays for it.
  • The partners agree on the project and not on the split.

Docs

120 sources we work from. Read them yourself.

The standards, registries, rules, data and tools behind each system, with a line on why each one matters.

Open the whole library
A wide river bending through farmland

Environautics

Management